Question
P’s 4 days work is equal to Q’s 5 days work. If P
and Q together can complete the work in 25 days then how much time Q will take to complete 40% of the work?Solution
Ratio of efficiency of P and Q = 5:4 Let the efficiency of P and Q be 5x and 4x units per day respectively. Total work = 9x × 25 = 225x units Required time = (0.40 × 225x)/4x = 22.5 days
Antennae are paired sensory organs on the heads of insects. Type of antennae found in butterflies is:
Which of the following is not an innovative technique of minimal processing
Which of the following is not matched correctly?
Botulism is an example or type of
The water requirement of groundnut crop is
Dual purpose breed of goat is ………….
When Pi is productivity per unit input of the limited or non-renewable resource, Si is alteration in soil properties, Wi is change in water resource an...
In meiosis synaptonemal complex develops during
The optimum time for sugarcane planting during the spring season in Punjab is:
The predominant sugar in insect hemolymph isÂ