Question
P’s 4 days work is equal to Q’s 5 days work. If P
and Q together can complete the work in 25 days then how much time Q will take to complete 40% of the work?Solution
Ratio of efficiency of P and Q = 5:4 Let the efficiency of P and Q be 5x and 4x units per day respectively. Total work = 9x × 25 = 225x units Required time = (0.40 × 225x)/4x = 22.5 days
If the entry code for Batch A on Thursday (4th May,2017) was “camera affixes to the hands knuckles that takes in”, then which of the fol...
What is the difference between the numbers which is third from the right end and second from the left end in Step V?
Input for Qs. 6 - 10: 28 33 92 35 73 46 84 11
In step II of th...
Which of the following would be the last step of the rearrangement?
How many steps are required to complete the given arrangement?
Step II of an input is: with the blurry photo of herself a
Which of the following is definitely the input?
What will be the 14th step for the following input?
Input: the rule changes will come into effect for
...Which element is between “depths” and “vitae” in step IV?
Who sits second to the right of seventh letter from right in step VI?
Which of following is correct with respect to the position of ‘63’ in step-V?