Question
36 workers are digging a tunnel 5 km long. After working
for 20 days, only 2/3 of the tunnel is completed. Then 4 more workers join the team. How many days are required to finish the remaining part?Solution
ATQ, Let the number of days to complete the remaining work be x. (36 Γ 20) / (2/3 Γ 5) = 40x / (1/3 Γ 5) (36 Γ 20) / (10/3) = 40x / (5/3) 216 = 24x x = 9 days
An amount is distributed among P, Q, R, and S in the ratio 12:8:5:6 respectively. If the amount received by Q is Rs. 1,600 , then find the amount receiv...
The mean proportional of 4 and 25 is _____.
βPβ had four Rs. 500 notes and a certain number of Rs. 50 notes with him while βQβ had eleven Rs. 200 notes and one Rs. 500 note with him. Later...
The ratio of two numbers A and B is 9:19 and C is 60% of the average of the numbers A and B. If the sum of A, B and C is 182, then what is the value of A?
84 is divided into two parts in such a way that the fourth part of the first part and the fifth part of the second are in the ratio 1 : 2. The first par...
Rs 1375 was divided among Anil, Bhanu and Charan in the ratio of 8:5:12 respectively. Find the amount received by Anil and Bhanu together.
- If βAβ, βBβ and βCβ are in proportion in the given order while βAβ = 12 and βBβ = 36, then find the value of βCβ.
If the ratio of number of boys and girls present in the playground is 5:4. 10 boys left the playground, leaving total number of girls same as the boys p...
Rs 1500 was divided among Sara, Ravi and Mohan in the ratio of 5:10:15 respectively. Find the amount received by Sara and Ravi together.
The ratio of two numbers P and Q is 6: 11 respectively. When 5 is added to P and 84 is subtracted from Q, then the ratio of P and Q becomes 5: 2 respect...