Question
P alone can finish a piece of work ‘M’ in 8
days while Q takes 4 days to finish it alone. P, Q and R working together can finish the work ‘N’ which is 15 times of work ‘M’ in 8 days. How long will R take to finish work ‘N’, when working alone?Solution
Let the work ‘M’ = 8 units (LCM of 8 and 4) Efficiency of P = 8/8 = 1 units Efficiency of Q = 8/4 = 2 units Efficiency of P, Q and R = (8 × 15)/8 = 15 units per day Efficiency of R = 15 – (1 + 2) = 12 units per day Time taken by R to finish work ‘N’ = 120/12 = 10 days
Where is the magnetic force of a bar magnet the strongest?
Which law describes the relationship between the force applied to a spring and its extension or compression?
What is the SI unit of power?
A circular coil of wire consisting of 120 turns, each of radius 12 cm carries a current of 0.30 A. What is the magnitude of the magnetic field B at the ...
A container is filled with two immiscible liquids of densities ρ₁ = 1000 kg/m³ (height 0.3 m) and ρ₂ = 800 kg/m³ (height 0.2m) stacked above eac...
Water flows through a horizontal pipe at a constant volumetric rate. At a location where the cross sectional area decreases, the velocity of the fluid:
The surface tension of water on adding detergent to it –
Which law explains the relation between pressure and volume of a gas at constant temperature?
Which of the following optical phenomena CANNOT convert unpolarised light to plane polarised light?
A sugar solution in a tube of length 2.0 dm produces optical rotation of 12°. Then, the sugar solution is diluted to one half of its initial concentra...