Question
P and Q can complete a work in 28 days and 42 days,
respectively. P, Q and R together can complete the work in 14 days. If R get a total wage of Rs. 5460 to complete the work alone, then find the per day wage of R.Solution
Let the total work be LCM of (28, 42 and 14) = 84 units Number of units of work done by P alone in one day = 84/28 = 3 units Number of units of work done by Q alone in one day = 84/42 = 2 units Number of units of work done by P, Q and R together in one day = 84/14 = 6 units Number of units of work done by R alone in one day = 6 β 3 β 2 = 1 unit So, time taken by R alone to complete the work = 84/1 = 84 days So, per day wage of R = 5460/84 = Rs. 65
Solve for x in the equation: 3(x + 2) + 2(2x - 5) = 5x + 9

If x = 19, then the value of x5 - 20x4 + 20x3 - 20x2 + 20x - 1 is
Given a triangle with two sides measuring 12 cm and 16 cm, which of the following cannot be a possible length for the third side?
The mean age of 30 students was calculated as 15 years. However, it was later discovered that one student's age was mistakenly entered as 15 years inste...
In a triangle ABC, a point D lies on AB and points E and F lie on BC such that DF is parallel to AC and DE is parallel to AF. If BE = 4 cm. EF = 6cm. th...
If a = 32, b = c = 31, then find the value of a 3 Β + b 3 Β + c 3 Β β 3abc.
If x3 + y3 = 9 and x + y=3 then the value of x4 + y4 is:
105, 111, 123, 141, ?, 195
Let {x + (1/x)} = 4, then Determine the value of {xΒ² + (1/xΒ²)}