Question
βAβ and βBβ can complete a certain work in 18
days and 20 days, respectively. They started working together and worked till completion of the work for which they got Rs. 19000 as wage. Find the share of βBβ out of total wage.Solution
Let total work = 180 units {LCM of (18 and 20)} Efficiency of βAβ = 180/18 = 10 units/day Efficiency of βBβ = 180/20 = 9 units/day Wages received by βAβ and βBβ will directly proportion to their efficiency. So share of βBβ = 19000 Γ (9/19) = Rs 9000
Which data analytics technique is suitable for handling missing data points in a dataset?
The dynamic memory allocation is the memory allocation done at the _________.
Which of these can be overloaded?
Which of the following is a valid token in lexical analysis?
What does a "Shared Lock" in a DBMS locking protocol allow?
Β
Consider a 4-way set associative cache consisting of 128 lines with a line size of 64 words. The CPU generates a 20-bit address of a word in main memor...
In dynamic programming, what is memoization?
What is the minimum no. of variables/ features required to perform clustering?
What is the basic component of an electronic circuit that restricts the flow of current?
When designing a sequential circuit, what is the purpose of flip-flops or latches?