Question
Ravi can finish 50% of a job in 20 days, while Ramesh
can finish 40% of the same job in 32 days. Both start working together, but Ravi leaves after some time. If the entire job is completed in 48 days, after how many days did Ravi leave?Solution
Time taken by Ravi to complete whole work = (20 ÷ 0.5) = 40 days
Time taken by Ramesh to complete whole work = (32 ÷ 0.4) = 80 days Let the total work be 240 units (LCM of 40 and 80)
Efficiency of Ravi = (240 ÷ 40) = 6 units/day
Efficiency of Ramesh = (240 ÷ 80) = 3 units/day Let Ravi worked for 'n' days.
(6 + 3) × n + 3 × (48 − n) = 240
9n + 144 − 3n = 240
6n = 96
n = 16 Hence, Ravi left after 16 days .
How many boxes are kept between box X and the box which contains Pencil?
Who lives immediately above E in the same type of flat?
How many seminars are conducted between Z’s seminar in morning and A’s seminar in pre-noon?
Who among the following attends music class on Wednesday?
How many such digits are there in the number ‘95746238571’ which will remain at the same position when they are arranged in the ascending order from...
How many boxes are placed between the box with HP and V?
If in a certain way ‘ACER’ is related to ‘Maruti’, ASUS is related to ‘BMW’ in the same way ‘Samsung’ is related to who among the follo...
Five persons, G, H, I, J and K, live in a five storey building. The floor which is at the bottom is numbered as 1, the floor above it as 2 and so on. J ...
Which of the following does not belong to the group?
Who among the following person doesn’t form a group?