‘A’ and ‘B’ can do a piece of work in 22 days
and 25 days, respectively. If they started the work together and worked on it for 6 days, then find the time taken by ‘B’ alone to complete the remaining work.Solution
Let total amount of work be 550 units Efficiency of ‘A’ = 550/22 = 25 units/day Efficiency of ‘B’ = 550/25 = 22 units/day Amount of work done by ‘A’ and ‘B’ together in 6 days = (25 + 22) × 6 = 282 units Time taken by B to complete remaining work = (550 – 282)/22 = 134/11 days
- Find the value of the expression {(4096) n /4  × 8 3n + 1 }/{(512) n  × 8 n – 1 }.
In Δ ABC, ∠ B= 68° and ∠ C 32°. Sides AB and AC are produced to points D and E, respectively. The bisectors of ∠ DBC and ∠...
If [2a + (1/2a)] = 5, then find the value of [4a² + (1/4a²) - 6]
- If ab = -15 and (a 2  + b 2 ) = 34, then find the value of (a – b).
- If (r + s) = 7 and rs = 15, then find the value of (r² + s²).
Given that x = 80, y = -35 and z = -45, Determine the value of [(x³ + y³ + z³)/10³]
A boat covers a distance of 75 km downstream in 2.5 hours. If the ratio of upstream speed to downstream speed of the boat is 3:5, then find the distance...
- The ratio of M to N is 4:9, and that of N to O is 3:2. If the difference between O and M is 60, what is the total of M, N, and O?
If (x – 12)3 + (x – 5)3 + (x – 7)3 = 3(x – 12)(x – 5)(x – 7) then find the value of (x2 + 5x...