Question
A and B together can do a work in 8 days. If A can alone
do the same work in 12 days, then in how many days B alone will do the same work?Solution
Total work = Number of days × 1 day’s work (efficiency) Total work = LCM (8, 12) = 24 unit 1 day’s work of (A+B) = 24/8 = 3 unit 1 day’s work of A = 24/12 = 2 unit 1 day’s work of B = 3 - 2 = 1 unit Now, Time taken by B to completed the work = 24/1 = 24 days
Which one of the following Azolla species tolerant to high temperature and salinity
Which soil structure is considered as  best for cultivation
The stage of mitosis during which the chromosomes condense and become visible is called:
A condition in which micro pores of soil are filled with water due to rain or irrigation, it is called
As per Food Safety and Standards, FSMS stands for
Which colour tag is used on foundation seed bags?
The correct order of boiling point of primary (1 Ëš ), secondary (2 Ëš ) and tertiary (3 Ëš ) alcohols is
Consider the following stages:
1. Spore germination      Â
2. Embryo infection
3. Spore on flower grain
4. Infected g...
- Which hormone is responsible for the let down of milk in cow?
Which one of the following statement/ option is correct about the crop rotation?