Question
A and B alone can complete a work in 15 and 30 days,
respectively. 50% of the work is completed by C in 2x days, and the remaining work is completed by A and B working together in ‘x’ days. Find the time taken by B and C to complete the whole work while working together.Solution
Time taken by A and B to complete the whole work while working together = (15 × 30)/(15 + 30) = 10 days So, x = 10/2 = 5 (Since, 50% of the work is done by A and B together) As, time taken by C to complete 50% of the work = 5 × 2 = 10 days So, time taken by C to complete the entire work = 10 × 2 = 20 days Therefore, time taken by B and C to complete the whole work while working together = (20 × 30)/(20 + 30) = 12 days
Which of the following potential is always negative?
In CRD design the degree of freedom for error is calculated by which formula?
Marconi wheat is known as:
Which crop is called 'camel crop"?
The synthesis of ATP via electron flow through the ETS, with oxygen as the terminal electron acceptor, is known...
According to latest Final estimates of Foodgrain production 2023-24, Which state is the largest producer of sugarcane in India?
Tikka disease of groundnut spreads fast under the conditions of:
Pradhan Mantri Krishi Sinchai Yojana (PMKSY) was launched in the year___
What is the meaning of the word "Chrysanthemum," as derived from its etymology?
Of which South-East-Asian country did Joko Widodo become the President in 2019 for the second time?