A and B together can finish a job in 12 days. B alone
takes 30 days. How long will A and C together take to finish the same job if C does one-fourth of A’s work?Solution
ATQ,
Work rates: A + B = 1/12 B = 1/30 So A = 1/12 – 1/30 = (5 – 2)/60 = 3/60 = 1/20 C = 1/4 of A = 1/80 A + C = 1/20 + 1/80 = (4 + 1)/80 = 5/80 = 1/16 Hence, 16 days
Which of the following box marked Red?
Number of boxes above A is same as the number of boxes below which of the following box?
____ is kept two boxes below box A?
Which of the following statements is true about the one who likes Lava?
Which of the following statements is correct?
Five boxes, D, E, F, G and H, are kept one above one another. The bottommost box is numbered as 1 and the topmost box is numbered as 5. E is kept three...
Who among the following lives on the bottommost floor?
R attends the exam on which of the following subjects?
Who among the following lives at the topmost floor?Â
Read the directions carefully and answer the following questions.
Seven persons O, P, Q, R, S, T, and U live in six floored building but not ne...