A and B together can finish a job in 12 days. B alone
takes 30 days. How long will A and C together take to finish the same job if C does one-fourth of A’s work?Solution
ATQ,
Work rates: A + B = 1/12 B = 1/30 So A = 1/12 – 1/30 = (5 – 2)/60 = 3/60 = 1/20 C = 1/4 of A = 1/80 A + C = 1/20 + 1/80 = (4 + 1)/80 = 5/80 = 1/16 Hence, 16 days
If the drainage coefficient is 3 cm/day, then the flow rate through drains of watershed of area 1500 hectares is
If an Indian citizen is denied a public office because of his religion, which of the following Fundam...
Name the mode of leaching:
Which among the following is Erosion ‐ resistance crop?
How many ATP molecules produced from the complete oxidation of a molecule of active acetate or acetyl Co-A
Which of following breed of sheep is also called 'Merino of Rajasthan'?
Sweet potatoes can be cured at around 30°C and 90-95% RH for:
Which of the following is/are irrational zone(8) of production
In C4 plants, the primary carboxylation takes place by using ___ enzyme
The bio ‐ industrial watershed concept was given by