If βPβ can complete a task in 24 days and βPβ
with βQβ together can finish it in 15 days, then how many days will βQβ take to complete the work alone?Solution
Let the total work = 120 units {LCM (24 and 15)} Efficiency of βPβ = (120/24) = 5 units/day Efficiency of βPβ and βQβ together = (120/15) = 8 units/day Efficiency of βQβ = (8 β 5) = 3 units/day Time taken by βQβ to finish the work alone = (120/3) = 40 days
Defines the number of entities in one entity set, which can be associated with the number of entities of other set via relationship set.
What is the primary function of a transistor?
The ALU (Arithmetic Logic Unit) is responsible for:
Which type of neural network architecture is specifically designed to process data with a variable-length sequence?
Which command is used to change the permissions of a file in a Unix/Linux system?
State Yes or No
Overfitting is a type of modelling error which results in the failure to predict future observations effectively or fit additi...
Which searching algorithm requires the data to be sorted beforehand?
Which device is responsible for making routing decisions in a network?
Which field in the IP header is used for fragmentation and reassembly of packets?
Which type of routing is manually configured by a network administrator and does not change auAtomatically?