Question
Time taken by 'X' and 'Y' to complete a work alone is 72
days and 120 days respectively. Find the time taken by 'X' and 'Y' together to complete 25% of the work.Solution
ATQ,
Let the total work be 360 units (LCM of 72 and 120) Efficiency of 'X' = (360 / 72) = 5 units/day Efficiency of 'Y' = (360 / 120) = 3 units/day Work to be completed = 25% of 360 = 90 units So, required time = (90 / (5 + 3)) = 90 / 8 = 11.25 days
Determine the value of (0.88)2
Two times a number, added to the square of that number, gives 3. What could be the possible answer for this number?
Find the value of ∛ 474552
Find the square of 572
What is the square root of 5476?
Find the Square root of √1681
Calculate the lateral surface area of a right circular cone having a radius of 5 cm and a height of 12 cm.
Find the square root of 0.0324.
If the average of two numbers is 13 and the square root of their product is 12, then the difference between the numbers is:
A horse is tethered to a peg fixed at one corner of a rectangular grass field measuring 45 metres in length and 25 metre...