Question
22 men can finish a piece of work in 20 days, while 44
women can do the same job in 30 days. How many days will 1 man and 1 woman take to complete the work together?Solution
ATQ,
Let the efficiency of a man and a woman be 'M' and 'W' units/day, respectively.
So, 22 Γ 20 Γ M = 44 Γ 30 Γ W
Or, M:W = 440 : 1320 = 1 : 3
Let M = 1e and W = 3e
Let the required time be 'T' days
So, (1e + 3e) Γ T = 22 Γ 20 Γ 1e
Or, 4T = 440
β΄ T = 440 Γ· 4 = 110 days
Two vehicles, named as 'X' and 'Y', travel along side-by-side paths but in opposite directions. The length of vehicle 'Y' surpasses that of 'X' by 12.5%...
A train travels 240 km at the speed of 60 km/h and the remaining distance at 80 km/h. If the total time taken by the train to cover the entire distance ...
The speed of βAβ and βBβ is 50 km/hr and 25 km/hr, respectively. If the distance covered by βAβ in βxβ hours is 200 km more than that by...
How much time a train 120 metres long running at the speed of 36 km/hr will take to cross a bridge 130 metres in length?
A train whose speed is 40 m/s crosses a bridge in 20 seconds. Another train which is 80m shorter than the first train crosses the same bridge at the spe...
A biker travels at a speed of 19 km/hr for 6 hours each day on all days except Sunday. If his journey starts on a Wednesday, on which day will he reach ...
A car which is traveling at a speed of 50 km/hr increased its speed by 10 km/hr after βyβ hours and after that, it traveled for (y + 7) hours more. ...
- A spherical ball has a diameter of 56 cm. Find its total surface area.
Rajesh drove at the speed 100 km/hr from his home to a resort. While returning he got struck in traffic and took 6 more hrs; he could drive only at the ...
If the sum of upstream and downstream speed is 32 km/hr and the speed of the current is 6 km/hr. Then find time taken to cover 44 km in downward?