Aman, Arun and Abraham can complete a work in 12, 20 and 24 days respectively. They all start working together. Aman left the work 1 day before its completion, Arun 3 days before, Abraham 4 days before. In how many days the work is finished?
Note: Here Aman leaves the work 1 day before the completion of the work, Arun 3 days before and Abraham 4 days before. If the work of the left days of these three is added, then together they can start and finish the work. Total work = 120+10+18+120 =168
A train started from station P and preceded towards station Q at a speed of 90 km/h. 54 minutes later, another train started from station Q and preceded...
Two trains approach each other at 21 kmph and 24 kmph from 2 places 270 km apart. After how many hours they will meet?
Train crosses a bridge which is 250 m long in 25 sec. Find the time taken by train to cross a man running in opposite direction at speed of 15m/sec. Fi...
400 metre long train ‘A’ is running with a speed of 61.2 km/hr. Train ‘B’ which is 442 metre long is running with a speed of 90 km/h in opposite...
Two trains ‘A’ and ‘B’ started from station ‘P’ and ‘Q’ towards station ‘Q’ and ‘P’ respectively at the same time. When they met...
Train P travelling at 60 km/hr crosses another train Q, having three fourth of its length and travelling in opposite direction at 30 km/hr in 28 seconds...
Train P travelling at 62 km/hr crosses another train Q, having three fourth of its length and travelling in opposite direction at 28 km/hr in 14 seconds...
Time is taken by two trains running in opposite directions to cross a man standing on the platform in 36 seconds and 21 seconds respectively. It took 27...
A 180 m long train crosses another 320 m long train running in the opposite direction in 10 seconds. If the shorter train crosses a pole in 9 seconds, w...
A train 400 m long running at 108 km/hr takes 35 seconds to cross a bridge. The length of the bridge is