Question
‘A’ can do a piece of work in 10 days. ‘B’ can
do 70% of the same work in 20 days. If they work together for the entire time and get paid Rs.1080, then find the share of ‘A’.Solution
Let the total work be 20 units. (LCM of 10 and 20) Efficiency of A = 20/10 = 2 units/day Efficiency of B = (20/20) × (70/100) = 2/3 units/day Ratio of the efficiency of A : B = 2 : 2/3 = 3:1 Share of A = (3/4) × 1080 = Rs.800
Which of the following is a key feature of the SARFAESI Act?
The RBI will develop a new interest rate benchmark based on secured money markets. Which of the following is the proposed new benchmark rate? Â
 Interest income earned on investments made by NRIs in India on non-repatriation basis ____
What is the alpha factor set by Basel Committee relating to the industry wide level of required capital for operational risk, under the Basic Indicator ...
What is the target of lending for domestic banks, as a % of their ANBC,under Priority sector lending for micro-enterprises?
What is the maximum loan-to-value (LTV) ratio allowed for loans sanctioned by banks against the pledge of gold ornaments and jewellery for non-agricultu...
Which new category has been introduced under the Pradhan Mantri Mudra Yojana to cover loans between ₹10 lakh and ₹20 lakh?
Systemic risk may arise due to ______
ABC Bank Ltd has extended a Rs.10 crore loan at 5% over the repo rate. The loan is to be repaid in equal quarterly instalments. The bank’s funding of ...
Under the revised bulk deposit guidelines for UCBs, Tier 3 and Tier 4 UCBs are allowed to raise bulk deposits only above a specific threshold. What con...