Question
A and B together can complete a piece of work in
32 days while A alone can complete 40% of the work in 32 days. Find the time taken by B to complete 60% of the work.Solution
Select the letter triad from the given options which follows the same relation as shown below.
(IL, FI, CF)
Select the option in which does not share the same relationship as that shared by the given pair of numbers.
16 : 102
Select the option that is related to the third number in the same way as the second number is related to first number and the sixth number is related t...
- Words given on the left side of (::) are related with each other by some Logic/Rule/Relation. Select the missing word/word pair on the right side of (::) f...
In the following question below are given some statements followed by some conclusions based on those statements. Taking the given statements to be tru...
If 3 # 2 # 6 = 53 and 7 # 1 # 4 = 66, then what is the value of P in P # 5 # 8 = 289?
65 : 31 :: 72 : ? :: 34 : 13
Portugal : Lisbon:: Norway : ?
Select the word-pair that best represents a similar relationship to the one expressed in the given pair of words.
(The words must be considere...
By interchanging the given two signs which of the following equation will be not correct?
+ and –