40 men can complete a piece of work in 24 days. All of
them started the work together, after 6 days how much more men will be required to complete the same work 6 days before the schedule time.Solution
ATQ,
Total amount of work = 40 Ă 24 = 960 units Amount of work done by 40 men in 6 days = 40 Ă 6 = 240 units Let âxâ more men are required So, (40 + x) Ă 12 = 720 Or, x + 40 = 60 Or, x = 20
Which one of the following is âMacaroni Wheatâ?Â
The vertical side of the furrow made in the soil away from which the turned soil is thrown is calledÂ
When was the Lakhpati Didi Yojana launched?
Which season in India receives the most important rainfall, contributing 80â95% of the total annual rainfall?
In which group of insects is the concept of physogastry observed, leading to the gradual swelling of the abdomen?
Which year was declared as the National year of Millets in India?Â
What is the unit of SAR (sodium adsorption ratio)?
Recommendation to control weeds in pearl millet crop through herbicides is pre emergence application of?
Sugarcane + Potato is an intercropping system of which season?
WHEN THE demand changes due to increase in its own price, it is known as