Question
A woman is one-third as efficient as a man. How much time
will 9 women take to complete a job that is 75% of the work done by 10 men in 12 days?Solution
ATQ,
Let the efficiency of each man be 3x units/day
So, total work = 3x × 10 × 12 = 360x units
And efficiency of a woman = 3x ÷ 3 = x units/day
So, required time = (360x × 0.75) ÷ (9 × x) = 30 days
What is the maximum loan amount under the 'Mudra' Shishu scheme?Â
In a Self-Help Group (SHG), the 'Corpus' of the group is primarily formed by:Â
'CIBIL Rank' for MSMEs (CIBIL MSME Rank) is provided on a scale of:Â
Regarding Letter of Credit (LC) and Bank Guarantee (BG):
1. LC is a primary payment mechanism used in trade.
2. BG is a contingent liabili...
A 'Hybrid' instrument is one that:Â
In case of securitization of standard assets, what is the Minimum Retention Requirement (MRR) for underlying loans of maturity – 24 months or less; ? ...
Under the Negotiable Instruments Act, 1881, which of the following is NOT a 'Negotiable Instrument' by statute?Â
Which of the following is not true about Pradhan Mantri Mudra Yojana?
1. Pradhan Mantri MUDRA Yojana (PMMY) is a scheme launched by the Hon’bl...
Under the prompt corrective action (PCA) framework, which of the following parameters is NOT monitored by the RBI?Â
What is the minimum paid-up equity capital required to set up a Small Finance Bank (SFB) as per current RBI norms?Â