Question
Abhay and Bhuvan working together can complete a sales
target in 24 days. Bhuvan and Chikku working together can finish the same sales target in 32 days. Abhay and Chikku working together can complete the sales target in 48 days. Determine the ratio of the number of days each of them individually takes to achieve the entire target.Solution
ATQ, Let total target achieved = 96 units Efficiency of (Abhay + Bhuvan) = 96/24 = 4 units/day Efficiency of (Bhuvan + Chikku) = 96/32 = 3 units/day Efficiency of (Abhay + Chikku) = 96/48 = 2 units/day Therefore, 2 × efficiency of (Abhay + Bhuvan + Chikku) = 9 units/day Or, efficiency of (Abhay + Bhuvan + Chikku) = 4.5 units/day Therefore, efficiency of ‘Chikku’ = 0.5 units/day Efficiency of ‘Abhay’ = 1.5 units/day Efficiency of ‘Bhuvan’ = 2.5 units/day Therefore, ratio of number of days taken by ‘Abhay’, ‘Bhuvan’ and ‘Chikku’, respectively = (1/1.5):(1/2.5):(1/0.5) = 5:3:15
A and B together can complete a work in 12 days, and B alone can complete it in 20 days. How many days will A take to complete the work alone?
A can complete a piece of work in 10 days. B in 15 days and C in 20 days. A and C worked together for two days and then A was replaced by B. In how many...
Machine X is 100% more efficient than Machine Y, and Machine Y is 75% more efficient than Machine Z. Machines X and Z, working together, can complete a ...
A man takes 200 days to finish a work alone. If he started working alone and joined by one more man having same efficiency as of him every day from 2nd ...
‘X’ and ‘Y’ together can complete a work in 16 days, while ‘Y’ and ‘Z’ together can complete the work in 10 days. If ‘Y’ takes 20 da...
A pipe can fill a tank in 14 hours, and B pipe can drain a tank in 21 hours. If a system of N pipes (fill pipes and drain pipes put together) can...
20 men or 40 women can complete a piece of work in 24 days. A man and a woman together complete the work and receive a total wage of Rs. 12,000. Find th...
Sushil can type 40 lines in 20 minutes but he leaves 8% margin on each line. In how much time he will type 46 pages with 80 lines on each page in which...
A and B are capable of completing a project individually in 40 days and 50 days, respectively. Initially, A and B collaborated on the project, and after...
4 girls can do work in 8 days, 3 boys can do the same work in 9 days, 7 men in 2 days, and 5 women in 4 days. Who is the least efficient?