Work efficiency of Chacha and Bhatija are in the ratio of 3 : 1. They working together to do a piece of work and completed the work in 24 days. Now in how many days the total work be finish if Chacha working alone?
Work efficiency of Chacha : Bhatija = 3 : 1 Total work done = 3 + 1 = 4 units then Total work done = 4 × 24 = 96 units Required time = 96/ 3 = 32 days
Which of the following chemical is used for polyploidy breeding?
Bent neck is a physiological disorder of which of the following flowers?
In Mango, tree banding is the preventive method used to control
Deficiency of vitamin D cause?
Fanging is related to ____
L-49 also known as Sardar is a selection from which variety of guava?
Most abundant and basic Auxin is _________
Vascular bundles in dicot stem are
Which of the following metabolic pathway produces carbohydrates?
What is the primary role of heat-shock proteins (HSPs) in plants under high-temperature stress?