Question
Pawan and Qureshi can complete a
task in 12 days, while Pawan and Rishi can finish the same task in 40/3 days. Initially, Pawan and Rishi begin working together. After 4 days, Qureshi joins them. All three work together for the next 6 days, after which Qureshi and Rishi leave the job. The remaining work is finished by Pawan alone in 1 day.Determine the time required for Qureshi, working alone, to complete the entire task.Solution
ATQ,
Let, total work be LCM of 12 and 40/3 = 120 units Units of work done by Pawan and Qureshi together in a day = 120/12 = 10 units Units of work done by Pawan and Rishi together in a day = 120/(40/3) = 9 units Let, units of work done by Qureshi alone in a day = βxβ units So, 9 Γ 4 + (9 + x) Γ 6 + (10 β x) Γ 1 = 120 36 + 54 + 6x + 10 β x = 120 5x = 20 x = 4 So, time taken by Qureshi alone to do the work = 120/4 = 30 days
Which of the following types of coal is called a brown coal among the following?
Kindly Study the following questions carefully and choose the right answer.
Human saliva contains an enzyme called salivary amylase that breaks...
Which type of glass is used for making chemical apparatus like beakers, flasks etc.?
The seed multiplication ratio of rapeseed, red gram, hybrid maize, sorghum and jute is:
The pores on the surface of leaves which help to take in the carbon dioxide are known as which of the
following?
Deficiency of _________ causes the leaves to develop a dark green colouration.
The SI unit of angular momentum is equivalent to which of the following?
In half-wave rectifier, what is the output frequency if the input frequency is 40 Hz. What is the output frequency of a full-wave rectifier for the same...
What is the percentage of nitrogen present in farm yard manure (FYM) in general?
The dimensions of angular momentum are: