‘X’ and ‘Y’ together can complete a work in 16 days, while ‘Y’ and ‘Z’ together can complete the work in 10 days. If ‘Y’ takes 20 days to complete the work alone then find the time taken by all three together to complete 45% of work.
Let the total work = 80 units Efficiency of (X + Y) = 80/16 = 5 units/day Efficiency of (Y + Z) = 80/10 = 8 units/day Efficiency of ‘Y’ = 80/20 = 4 units/day Efficiency of (X + Y + Z) = (1 + 4 + 4) = 9 units/day Required time taken = (0.45 × 80)/9 = 4 days
Which Excel function is used to find the average of a range of cells?
________ refers to two way communication but not at the same time.
The layer which is used for routing data between networks in the OSI model is ?
Which layer of the OSI model deals with data segmentation and reassembly?
The operating system determines a manner in which all the following occur except
System Software includes which of the following?
In the OSI model, which layer is responsible for translating data into a format that the application layer can interpret?
What is the purpose of NAT (Network Address Translation) in a computer network?
Which of the following software is generally preferred most, to write a House Report to the Principal of the school, with some basic text and paragraph...
In an operating system, which component is responsible for managing memory and allocating resources to different processes?