Question
Akhil and Nikhil together can complete a work in 5 days
while Nikhil alone takes 10 days to complete 40% of the work. If the efficiency of Sachin is 25% more than that of Akhil, then find the time taken by Sachin alone to complete the whole work.Solution
Time taken by Nikhil to complete the whole work alone = 10/0.40 = 25 days Let the total work = 25 units Efficiency of (Akhil + Nikhil) = 25/5 = 5 units/day Efficiency of Nikhil = 25/25 = 1 units/day Efficiency of Akhil = 5 - 1 = 4 units/day Therefore efficiency of Sachin = 1.25 x 4 = 5 units/day Time taken by Sachin to complete the whole work alone = 25/5 = 5 days
Consider two concentric circles having radii 17 cm and 15 cm. What is the length (in cm) of the chord, of the bigger circle, which is a tangent to the s...
If O is the orthocentre of ΔABC , if ∠ BOC = 105 0 then what is the measure of ∠ BAC?
In the given figure CD is parallel to AB then ∠y is?

If O is circumcentre of acute angled triangle ABC, if ∠ OBC = 150 then ∠BAC = ?
- Length of a chord in a circle of radius 'r' cm, is 40 cm and distance between chord and centre of the circle is 21 cm. Find the value of (2r + 1).
The sides of a triangle are 10 cm, 17 cm, and 21 cm. Find the area of the triangle using Heronโs formula.
The radius of the incircle of a triangle is 8 cm. if the area of the triangle is 56 cm 2 , then its perimeter is?
The internal bisector of โABC at โ A cuts BC on D and cuts the circumcircle at E. If DE = 6cm, AC = 8cm and AD = 10 cm, then find the length of AB?
Find the area of triangle having sides 5 m, 6 m, and 9 m.