Question
Akhil and Nikhil together can complete a work in 5 days
while Nikhil alone takes 10 days to complete 40% of the work. If the efficiency of Sachin is 25% more than that of Akhil, then find the time taken by Sachin alone to complete the whole work.Solution
Time taken by Nikhil to complete the whole work alone = 10/0.40 = 25 days Let the total work = 25 units Efficiency of (Akhil + Nikhil) = 25/5 = 5 units/day Efficiency of Nikhil = 25/25 = 1 units/day Efficiency of Akhil = 5 - 1 = 4 units/day Therefore efficiency of Sachin = 1.25 x 4 = 5 units/day Time taken by Sachin to complete the whole work alone = 25/5 = 5 days
Neutron scattering technique of soil water measurement is not suitable for
Practice of forestry in areas devoid of tree growth and other vegetation situated in places away from the conventional forest areas is called
During the light-dependent reactions of photosynthesis, ATP and NADPH are produced in the:
One-step resource for managing all activities of food testing through online interface is called as:
The Indian institute of sugarcane research is located at______.
In temperate climates, pruning should not be done near the end of the summer because :
Chemical generally used for correcting soil acidity is:
Which variety of moong takes shortest period to mature:
Which of the following is the correct order of taxonomic ranks, from most specific to most general?
Algae which is used in monitoring the water quality of estuaries is