Question
Peter and Rachel can complete a project together in 20
days. Peter takes four times as long as Rachel to complete the same project alone. Find the time taken by Rachel to complete the project alone.Solution
ATQ, Let Rachel's time to complete the project alone be 'r' days. Therefore, Peter's time is '4r' days. Their combined work rate is (1/r) + (1/4r) = (1/20). Rachel can complete the project alone in 25 days.
Why exhausting is done in canning
a)Â Â Â To avoid the corrosion of tinplate and pin holing during storage.
b)Â Â Â To minimize dis...
Which of the following Additives are used in the manufacture of cheese?
Options:
1. Propionic acid
2. Calcium chloride
3. So...
Caramels are firm ______ candies and the added substance that may interfere with crystallisation are________
This highly alkaline substance neutralizes acidic chyme for enzyme action. It is called:
The thermal conductivity of food is influenced by
Vacuum-packaged meats are spoiled by:
(I) Bacteria
(a) 0.9- 0.95
(ii) Yeast
(b) Staphylococcus
(iii) molds
(C ) Entamoeba
(iv) Protozoa
(d) 0.7-0.8
Full-cream milk contains:
Fermentation of glycerol in wine results in_____
Which is not a proactive preventive approach to food safety?