Question
'Ramesh' can complete a work in 40 days. He started the
work and left after 24 days from starting. The remaining work was done by 'Suresh' in 30 days. Find the time taken by 'Suresh' to complete 75% of the work.Solution
ATQ,
Fraction of work completed by 'Ramesh' = (24/40) = (3/5)
Remaining work = 1 - (3/5) = (2/5)
Time taken by 'Suresh' to complete (2/5)th of the work = 30 days
Time taken by 'Suresh' to complete the whole work = 30 × (5/2) = 75 days
Therefore, time taken by 'Suresh' to complete 75% of the work = 0.75 × 75 = 56.25 days
The inter-row space between two adjacent rows of the base crop in paired row planting isÂ
Which grafting method requires making a downward vertical split on the stub for inserting the scion?
Which irrigation method is suitable for cotton grown in heavy soils like clay and loam, reducing water usage by 50%?
The highest number of resistant weeds are associated with which group of herbicides?
Movement of leaves of sensitive plant, Mimosa pudica are due to
Which technique is more useful for seeding cold clouds?
Cell is the fundamental structural and functional unit of all living organisms. It was first discovered by ____
Parturient paresis or milk fever is a disease in cattle is caused due to the deficiency of ____
Severe drought occurs when deficiency of rainfall is above :
Which of the following markets is based on degree of competition?