Question
Rahul, Sameer, and Dinesh can
complete a task in 24 days, 36 days, and 18 days, respectively. They started working together, but Rahul left after 3 days. How long will it take Sameer and Dinesh to finish the remaining task?Solution
ATQ,
Let the total work be 432 units. Efficiency of Rahul = 432 ÷ 24 = 18 units/day Efficiency of Sameer = 432 ÷ 36 = 12 units/day Efficiency of Dinesh = 432 ÷ 18 = 24 units/day Work done in the first 3 days = 3 × (18 + 12 + 24) = 162 units Remaining work = 432 – 162 = 270 units Required time = 270 ÷ (12 + 24) = 270 ÷ 36 = (135/13) or Â
A piece of ice is floating in water kept in a beaker. When all the ice melts the level of water will -
When a capacitor is fully charged in a DC circuit, the current through it is:
Frequency modulation (FM) changes:
A conducting rod of length 0.2 m is rotated with angular velocity 10 rad/s about one end in a uniform magnetic field of 0.5 T perpendicular to the plane...
The term ‘Isoneph' indicates the lines of equal –
Compared to fresh Water, the freezing point of sea water is -
‘Lubb-dupp’ sound is produced due to the action of
A soap bubble shows colours when illuminated with white light. This is due to –
If the specific heat at constant pressure Cₚ is greater than Cᵥ , the difference Cₚ -Cᵥ is equal to:
What does Ohm's Law state? Â