Question
Rahul, Sameer, and Dinesh can
complete a task in 24 days, 36 days, and 18 days, respectively. They started working together, but Rahul left after 3 days. How long will it take Sameer and Dinesh to finish the remaining task?Solution
ATQ,
Let the total work be 432 units. Efficiency of Rahul = 432 ÷ 24 = 18 units/day Efficiency of Sameer = 432 ÷ 36 = 12 units/day Efficiency of Dinesh = 432 ÷ 18 = 24 units/day Work done in the first 3 days = 3 × (18 + 12 + 24) = 162 units Remaining work = 432 – 162 = 270 units Required time = 270 ÷ (12 + 24) = 270 ÷ 36 = (135/13) or
- A garage has dimensions of 28 metres in length, 14 metres in breadth, and 10 metres in height. If each equipment unit needs 140 m³ of space, how many unit...
Length and breadth of a rectangle are in the ratio 7:9. If the perimeter of the rectangle is 46 cm more than the breadth of the rectangle, then find th...
If the perimeter of rectangle is 56 cm and its length is 2 cm more than breadth then find its area?
A cylindrical tank has a radius of 7 meters and a height of 10 meters. Find the volume of the tank in cubic meters.
The volume of a hemisphere is 2425 (1/ 2) cm3 . Find its radius (Take p = 22/7)
A solid metallic cone with a radius of 6 cm and height of 12 cm is melted and recast into smaller cones with a radius of 3 cm and a height of 4 cm. How ...
A rectangular shaped pit of length 18 ft and breadth 16 ft is made in a rectangular field of length 64 ft and breadth 52 ft. The earth dug out of the p...
Perimeter of a rectangle is 40% more than that of a square of side 25 cm. If the difference between the length and breadth of the rectangle is 12 cm, re...
A circle has a radius of 21 cm and the area of its sector is 308 cm². Find the angle subtended by the arc at the center of the circle. (Use π = 22/7)<...
- If the edge of the cube is increased by 30%, then find the percentage increase in the volume of the cube.