Question
Sachin can do a work in 80 days. He works on it for 10
days and then Saurav alone finishes the remaining work in 42 days. In how many days can Sachin and Saurav finish the work together? type-sscSolution
 From the question, 1 Work done by Sachin in 1 day = 1/80 Work done by 1 Sachin in 10 days = 1/ 8  Remaining work = 1-1/8 =7 /8  work is finished by Saurav in 42 days = 7/8 1 part of the work will be done by Saurav = 42×8/ 7 = 48 days’ Time taken by Sachin and Saurav to do the work- SachinSaurabh 8048 480 610 =480/6+10 =30days.
A financial organization is aiming to reduce operational costs by analyzing transactional data to identify inefficiencies. Which of the following roles ...
Which of the following is the most accurate example of metadata?
In hypothesis testing, what does a low p-value (e.g., p < 0.05) suggest about the null hypothesis?
Which of the following is NOT a typical step in NLP text preprocessing?
Which sampling technique is best suited for dividing a population into distinct subgroups and ensuring each subgroup is proportionally represented?
Which of the following SQL operations is used to combine data from two or more tables based on a related column?
What is the primary objective of exponential smoothing in time series forecasting?
In developing a fraud detection model for online transactions, a data analyst should use a technique capable of identifying anomalous patterns. Which of...
In time series forecasting, what is the primary role of the ARIMA model ?
A time series dataset shows monthly sales data for a retail store over the last three years. After performing decomposition, you observe that the residu...