Question
If 6 women can complete a work in 3 days, and 9 girls
can complete the same work in 2 days, then find the time taken to complete the same work by 8 women and 6 girls?Solution
6 women can complete a work = 3days 1 woman can do a work = 6×3=18days 9 girls can complete the same work=2days 1girl can do a work = 2×9=18days AB 1818 18T.W 11 Efficiency (8 women and 6 girls) can do this work = 18/8×1+6×1 =18/14=9/7days.
The average of three numbers a, b and c is 2 more than c. The average of a and b is 48. If d is 10 less than c, then the average of c and d is:
If the sum of three numbers is zero, then which of the options below will always be equal to the value of the sum of the cubes of those numbers?
If  x = 19 , find x 5 - 20  x 4 + 20  x 3 - 20x 2 + 20x  - 20 = ?
Given that x8-34x4+1=0, x>0. What is the value of (x3+ x-3)?

If x2a = y2b =z2c ≠ 0 and x2 = yz, then the value of (ab + bc + ca) /bc is :
when x =4 and y =-6 then find the value of 27x³ +58x²y +31xy² +8y³?
Given that x = 80, y = -35 and z = -45, Determine the value of [(x³ + y³ + z³)/10³]
22% of ‘x’ is equal to 66% of ‘y’, then find the value of x: y.
If, 4x + y = 10, and 2xy = 8, and 4x > y, then find the value of 64x³ – y³.