Question
Virat can do a piece of work in 30 days and Sachin can
do the same work in 45 days. If Virat works for 5 days and got Rs. 2100, and the remaining work will completed by Sachin, then how much rupee Sachin earned?Solution
Assume total work = LCM (30, 45) = 90 If the entire work is 90 units, Virat can complete 3 unit per day, and Sachin can complete 2 unit per days In 5 days, Virat completes 15 units and got Rs.2100 i.e. Rs.140 per unit. Remaining work = (90 – 15)unit = 75 unit ∴ Sachin earning = Rs.75 × 140 = Rs. 10500
ChemicallyAmistar Top 325 SC is ------------- and used for controllingÂ
ICAR- Indian Institute of Rice Research is situated atÂ
This district administration introduced a QR code system for disposal and recycling of plastic bottles and items used by devotees on the yatra route, le...
Wax coating treatment enhance the shelf life of fruits because it block the
According to the the census of India 2011, What is the Percentage of Rural Population of India
Which sowing method involves placing seeds in holes made in the seedbed at a fixed spacing?
Given below are two statements
Statement I: C3 weeds such as Avena fatua, Phalaris minor and Chenopodium album are generally more competitive...
Which is the yellow coloured variety of capsicum?
A person got his soil sample analysed and received a test report mentioning soil pH 8.3; ESP 12% and electrical conductivity 5.2 ds m-1.
...The gas used for filling weather balloons is-