Start learning 50% faster. Sign in now
Assume total work = LCM (30, 45) = 90 If the entire work is 90 units, Virat can complete 3 unit per day, and Sachin can complete 2 unit per days In 5 days, Virat completes 15 units and got Rs.2100 i.e. Rs.140 per unit. Remaining work = (90 – 15)unit = 75 unit ∴ Sachin earning = Rs.75 × 140 = Rs. 10500
ICAR – Central Institute of Agriculture Engineering is located at
Cider is prepared from
…………is a pretreatment of seeds that aims to break seed dormancy through puncturing, burning, breaking, filing, and scratching with knives, nee...
In Animal science the term Stag refers to
Bagasse is a by-product of:
A Double top cross refers to:
Which wheat rust is known as a killer disease?
Study of soil in relation to growth and development of plant is known as:
This species considered one of the parents for Korean hybrids in Chrysanthemum breeding is
Name the dual purpose breed of cattle that belongs to Maharashtra?