ATQ,
Let the efficiency of Arjun be 'x' units per hour
Therefore, total work = 4 × 28 × x = 112x units
Let the time he should work to complete the work in 16 days be 'y' hours a day.
ATQ;
112x = 16 × y × x
Or, y = 7
Therefore, he should work for 7 hours a day.
Alternate solution:
Required time = (4 × 28) ÷ 16 = 7 hours
Pipe L can empty the tank which is 45% filled in 9 hours. The time taken by pipe K and J together to fill an empty tank completely in 7.5 hours. Pipe J ...
Pipe ‘A’ can fill a tank in 30 hours while pipe ‘B’ can empty it in 40 hours. They were operated on alternate hours starting with pipe ‘A’. ...
In what time would a Cistern be filled by three pipes whose diameter are 2cm, 2 2/3cm and 4cm running together, where the largest pipe alone fill it in ...
Two pipes A and B can fill a tank in 24 min., and 32 min, respectively. If both the pipes are opened simultaneously, after how much time B should be clo...
Tap A and Tap B fill a drum of volume 483 liters in 21 minutes. If their efficiencies are in the ratio x:y respectively and B alone takes to fill the ci...
Tap ‘A’ and tap ‘B’ can fill a tank in 64 hours and 56 hours, respectively. If both taps are opened together, then find the time after which tap...
Pipe ‘A’ can fill a tank in 16 hours. Pipe ‘B’ is ____% as efficient as pipe ‘A’. If both pipes are opened simultaneously, the tank will be ...
There are 6 inlet and (x-2) outlet pipes attached to a tank. Each inlet pipe takes 20 hours to fill the tank and each outlet pipe empties the fully fill...
Two pipes, X and Y, can individually fill a tank in 50 minutes and 25 minutes respectively. If both pipes are opened simultaneously, after how much time...
Pipe ‘A’ can fill a tank in 10 hours while pipe ‘B’ can empty it in 12 hours. They were operated on alternate hours starting with pipe ‘A’. ...