Question
A team leader can do a job as fast as three members of
the team working together. If one of the member can do the job in 5 hrs, the second one takes 10 hrs while the third one takes 25 hours for the same, how much time approximately is taken by the leader alone to complete the work?Solution
Work done by all the three members in 1 hour = `1/5+1/10+1/25` `=(10+5+2)/50 = 17/50` part of the work ∴ Time taken by them to complete the work = `50/17` hrs ∴ Time taken by the leader = `50/17` hrs = 3 hrs (approx.)
- A bag contains 9 white balls, 6 black balls, and 3 green balls. Two balls are drawn at random. Find the probability that the two balls are white.
A person can hit a target 3 times out of 8 shots. If he fires 10 shots, what is the probability that he will hit the target twice
What is the probability that three S’s come consecutively in the word ‘SUCCESSION’?
A box contains 8 yellow marbles, ‘x’ blue marbles and 12 white marbles. A box contains 5 yellow marbles, 2 blue marbles and 3 white marbles. The pro...
Determine the probability that when a hand of 7 cards is drawn from a box of 52 cards, it consists at least 3 kings?
Given that E and F are events such that P(E) = 0.8, P(F) = 0.4 and P(E∩ F) = 0.2. Find P(F|E).
In a lottery, there are 8 prizes and 20 blanks. A lottery is drawn at random. What is the probability of getting a prize?
...A bag contains 3 black balls, 7 red balls and 5 white balls. Two balls are drawn simultaneously. Find the probability that both the balls are of same c...
Tokens numbered 1 to 350 are in a bag. What is the probability that the Token drawn has a number which is a multiple of 6 or 7?
A bag contains 14 black and 16 white balls. One ball is drawn at random. What is the probability that the ball drawn is white?