Question
Virat can do a piece of work in 18 days and Sachin can
do the same work in 27 days. If Virat works for 3 days and got Rs. 2700, and the remaining work will completed by Sachin, then how much rupee Sachin earned?Solution
Assume total work = LCM (18, 27) = 54 If the entire work is 54 units, Virat can complete 3 unit per day, and Sachin can complete 2 unit per days In 3 days, Virat completes 9 units and got Rs.2700 i.e. Rs.300 per unit. Remaining work = (54 – 9)unit = 45 unit ∴ Sachin earning = Rs.45 × 300 = Rs. 13500
Pusa Deepali is a variety of:
Capitate type of antenna are found in _____
Bud scales (cataphylls) are_____ designed for protecting buds (apical or axillary).
Part of the cell wall of endodermal cells prevents water from moving into the cell is calledÂ
Eugenol is the important chemical content of:
The typical pH value of the midgut in most insects is closest to which of the following values?
Microorganisms used for suppression of plant diseases are called as ____
Judicious removal of plant part to obtain better and qualitative yield is termed asÂ
Chlorophyll is the major pigment present in leaves ,Which element is known as a ‘constituent of chlorophyll’?
Out of the following quantity, which is required to irrigate 1.0 ha land area with 50mm depth of irrigation?