Question
Virat can do a piece of work in 18 days and Sachin can
do the same work in 27 days. If Virat works for 3 days and got Rs. 2700, and the remaining work will completed by Sachin, then how much rupee Sachin earned?Solution
Assume total work = LCM (18, 27) = 54 If the entire work is 54 units, Virat can complete 3 unit per day, and Sachin can complete 2 unit per days In 3 days, Virat completes 9 units and got Rs.2700 i.e. Rs.300 per unit. Remaining work = (54 – 9)unit = 45 unit ∴ Sachin earning = Rs.45 × 300 = Rs. 13500
How is T related to S?
Who among the following person/persons are heavier than the fourth shortest persons?
I. R
II. T
III. W
Read the directions carefully and answer the following questions.
There are six persons Yogesh, Prakash, Ramesh, Shyam, Ram, and Lokendra sitti...
In a row of 40 girls, when Komal was shifted to her left by 4 places her number from the left end of the row became 10. What was the number of Swati f...
Among seven friends S, T, U, V, W, X and Y. T is taller than only four other friends. U is taller than V. S is taller than X. W is taller than one perso...
How many cartons are lighter than E?
Six players S, T, U, V, W, and X scored different runs in a cricket match. V scored more than X and S. Three players scored more than W, who scored just...
R, S, T, U, V and W have different heights. R is taller than V, Only U and W are shorter than V. More than one person is taller than R. S is not shorte...
Statement : "The government has decided to build more highways to improve connectivity."
Assumptions :
I. Highways help in economic grow...
David is ranked 15th from the top in his class. When counted from the bottom, he is ranked 126th. What is the total number of students in the class?