Question
A and B together can complete a piece of work in 48 days
while B and C together can complete the same work in 58 days. All of three together can complete 80% of the whole work in 26.4 days then find the time taken by A and C together to complete the whole work. Note: You have to find approx. valueSolution
Time taken by A, B and C together to complete the whole work = 26.4/0.80 = 33 days Let total amount of work = 15312 (LCM of 48, 58 and 33) Efficiency of (A + B) = 15312/48 = 319 units per day Efficiency of (B + C) = 15312/58 = 264 units per day Efficiency of (A + B + C) = 15312/33 = 464 units per day Efficiency of A = 464 β 264 = 200 units per day Efficiency of C = 464 β 319 = 145 units per day Desired time = 15312/345 = 44.4 days = 44 days
If x = 2 + √3 then find the value of x3/2 + 1/(x3/2) = ?
The efficiency of A,B,C,D are in the ratio of 6:5:4:3. If A and C can do a work together in 6 days. Then How many days B and D will take to complete the...
The ratio of two number is 6 : 5 and their HCF is 15. So find and their LCM?
Total surface area of a Cuboid is 592 cm ² and the Sum of its Length, breadth and height is 30cm, then find out the sum of the squares of its lengt...
If x+ 1/x = 3, then find the value of 2x/(3x²-5x+3)
If 4x + 1/5x = 4, then find value of 125x³ + 1/64x³
The diameter of the base of a cylindrical drum is 21 dm and the height is 12 dm. It is full of petrol. How many tins each of size 15 cm × 11 cm &t...
Two boys are on opposite sides of a tower of 100 m height. If they measure the elevation of the top of the tower as 30° and 45° respectively the...
A girl found the answer for the question “subtract the sum 1/2 and 1/8 from unity and express the answer in decimals” as 1.5. The percentage...
If the Simple Interest and Compound Interest of a sum of money for two years are Rs. 1800 and Rs. 1935 respectively. Then find out the sum?