A and B together can complete a piece of work in 40 days while B and C together can complete the same work in 36 days. All of three together can complete 80% of the whole work in 26.4 days then find the time taken by A and C together to complete the whole work.
Note: You have to find approx. value
The sum of the total surface areas of two cubes is 1926 cm2. If the product of the length of their edges is 136 cm2, then find the...
The radius of the base of a cylinder is 14 cm and its curved surface area is 880 cm². Its volume (in cm³) is: (Takе π = 22/7)
Which of the following numbers is a divisor of (4915 – 1)?
A stone is thrown vertically with the velocity which would just carry it to height of 100 feet. Two seconds later another stone is projected vertically ...
The cost of fencing a rectangular field at the rate of Rs. 5/metre is Rs. 450. If the length of the field is 11 metres more than its breadth, then find ...
The cost of levelling a square field @ Rs.32 per sq. metre is Rs.2,88,800. Field is to be fenced and also 2 metres broad pathway is to be cons...
A tank whose length, width and height are 23 metres, 20 metres and 12 metres respectively is completely filled with juice. If the juice costs Rs.5/m
Find the length of the side of a regular octagon which is formed by cutting the corner of square of side 30 cm?
If the curved surface area and the radius of a cylinder are 550 cm2 and 7 cm, respectively, then find the volume (in cm3) of the c...
A tank whose length, width and height are 19 metres, 14 metres and 10 metres respectively is completely filled with juice. If the juice costs Rs.5/m