Question
Anil and Ashish receive Rs.2000 for work of 10 days. If
Anil is 4 times efficient than Ashish, then find the daily wage received by Ashish.Solution
1 day wage of Anil and Ashish = 2000/10 = 200 Efficiency ratio of Anil : Ashish = 4:1 Daily wage of Ashish = 200 x (1/5) = Rs.40
Which data analytics technique is suitable for handling missing data points in a dataset?
The dynamic memory allocation is the memory allocation done at the _________.
Which of these can be overloaded?
Which of the following is a valid token in lexical analysis?
What does a "Shared Lock" in a DBMS locking protocol allow?
Consider a 4-way set associative cache consisting of 128 lines with a line size of 64 words. The CPU generates a 20-bit address of a word in main memor...
In dynamic programming, what is memoization?
What is the minimum no. of variables/ features required to perform clustering?
What is the basic component of an electronic circuit that restricts the flow of current?
When designing a sequential circuit, what is the purpose of flip-flops or latches?