Question
A work can be completed by βAβ and βBβ, alone in
14 days and 7 days, respectively. Find the number of days taken by βCβ to complete the same work alone if βAβ, βBβ and βCβ together can complete the whole work in 2 days.Solution
Let total work = 14 units (LCM of 14 and 7) Efficiency of βAβ = (14/14) = 1 units/day Efficiency of βBβ = (14/7) = 2 units/day Combined efficiency of βAβ, βBβ and βCβ = (14/2) = 7 units/day Efficiency of βCβ = 7 β (1 + 2) = 4 units/day Required time taken = (14/4) = 3.5 days
According to the 2024β25 second advance estimates, what is the total horticulture production in India?
What is the minimum number of farmers required to form an FPO in the plains under the scheme?
Maximum profit is obtained at the point, where:
Loose smut in wheat can be effectively controlled by
Ozone layer which absorbs and scatters the solar ultraviolet radiation is present in which layer of atmosphere?
βCrop loggingβ is a method of:
Soil quality is generally enhanced by greater_____________
The T value (soil loss tolerance) refers to __________for a specific soil.
According to latest Final estimates of Foodgrain production 2023-24, Which state is the largest producer of sugarcane in India?
Who is father of extension in India?