Question
A can complete a work in 9 days , and B can complete
it in 18 days . They work together with C and complete the work in 3 days . In how many days can C alone  complete the work?Solution
Assume total work = LCM(9, 18) = 18 units A’s rate = 18/9 = 2 units/day B’s rate = 18/18 = 1 unit/day Let C’s rate = x units/day Total rate = (2 + 1 + x) units/day = (3 + x) They finish in 3 days: (3 + x) × 3 = 18 9 + 3x = 18 3x = 9 → x = 3 units/day Time for C alone = 18 / 3 = 6 days
Which elite Naval Air squadron in the Andaman & Nicobar Command carried out the maiden all-women maritime surveillance mission on March 08, 2024? Â
Who established the Chishti sect in India?
Which bank has become the first to officially introduce the Mahila Samman Savings Certificate (MSSC) scheme?Â
In case of sugarcane, the planting material is obtained from:
Which of the following sports was included as a discipline in the 11 th Asian Games Beijing 1990?Â
__________ introduced the virtual currency as a legal tender and became the first ever country to do so.
The dress of Rajasthani 'Tara Bhant ki Odhni' is popular in -
Where is the headquarters of ESAF Small Finance Bank located?
The following major rivers of Uttarakhand state will be in decreasing order according to their length:
1. Kosi
2. Bhagirathi
3. Kali
4. Alaknanda
With which of the following Financial Institution, Gruh Finance was merged?Â