Question
Two typists of different speeds can complete a typing
job together in 6 minutes. If the 1st typist types alone for 4 minutes and then the 2nd typist types alone for 6 minutes, they would be left with 1/4 of the total work. In how many minutes can the slower typist complete the job working alone?Solution
ATQ, Let the 1st typist take x minutes and the 2nd typist take y minutes to complete the work alone. Then, 1/x + 1/y = 1/6 ---- (i) When 1st types 4 minutes and 2nd types 6 minutes, work done = 3/4, so 4/x + 6/y = 3/4 ---- (ii) From (i), 1/x = 1/6 β 1/y Substitute in (ii): 4(1/6 β 1/y) + 6/y = 3/4 4/6 β 4/y + 6/y = 3/4 2/3 + 2/y = 3/4 2/y = 3/4 β 2/3 2/y = (9 β 8)/12 = 1/12 y = 24 From (i), 1/x + 1/24 = 1/6 1/x = 1/6 β 1/24 = 4/24 β 1/24 = 3/24 = 1/8 x = 8 Slower typist takes = 24 minutes.
Deficiency of which vitamin causes neural tube defect?
The training curriculum for FSO is _____ days long.
What is the full form of 'CHA'?
Which one of the following is not the function of EIC
Eugenol is important ingredient of oil of
Which of the following is used to preserve colored food products?
Name the breed of fowl producing dark colour meat?
What is the full form of GSFA?
Food corporation of india was established on
At least _____ of the establishments in Clean Street Food Hub should sell regional cuisine.