Question
Meena and Mohit, alone can complete a work in 12 days
and 18 days, respectively. They started the work together and left after 4 days such that the remaining work is completed by Mehul alone in 6 days. If the total wage fixed for completing the work is Rs. 540, then find the share received by Mehul.Solution
Let total work = 36 units {LCM of 12 and 18} So, efficiency of ‘Meena’ = (36/12) = 3 units/day Efficiency of ‘Mohit’ = (36/18) = 2 units/day Amount of work done by Meena in 4 days = 3 × 4 = 12 units Amount of work done by Mohit in 4 days = 2 × 4 = 8 units Amount of work done by Mehul = 36 – (12 + 8) = 16 units Ratio of amount of work done by Meena, Mohit and Mehul = (12 : 8 : 16) = (3 : 2 : 4) Required wages of Mehul = {4/(3 + 2 + 4)} × 540 = Rs. 240
Determine the co-ordinates of the point where the line through the points A (3, 4, 1) and B (5, 1, 6) crosses the XY- plane?
Find the Perpendicular distance between two lines
6x + 8y = 18, 12x + 16y =20
If P(A) = 0.7, P(B) = 0.5 and P (B/A) = 0.3, find (i) P(A/B) (ii) P(A ∪ B)?
The slope of the equation 24x+8y=56 is
The minute hand of a watch is 2 cm long. How far does its tip move in 45 minutes? (use π = 3.14)
If two parallel lines are intersected by a transversal, then which of the options below is not necessarily correct?
Find the area of triangle formed by lines 4x-6y=24 x-axis and y-axis?

Solve: ∫[2x/(x4+1)] dx