Question
βFβ is 66.67% more efficient than βGβ. βGβ
worked alone for 10 days, and then βFβ completed the rest of the work. If the entire job was finished in 35 days, how long would βFβ take to do the work alone?Solution
Let the efficiency of βGβ = 3x units/day Efficiency of βFβ = 5x units/day Time taken by βFβ = 35 β 10 = 25 days Total work = 10 Γ 3x + 25 Γ 5x = 30x + 125x = 155x units Required time = 155x / 5x = 31 days
What does the term "Instrumental Conditioning" refer to?
The smallest 3-D volume of soil needed to give full representation of horizontal variability of soil is termed as__
A lateral branch arising from the base of main stem and which is used for propagation of some fruit plants is
Given below are two statements
Statement I: Use efficiency of fertilizer NPK can be improved by following integrated nutrient management (INM...
The organic matter content of the peat soil is
Which of the following pair is not correct?
Generally fats with saturated fatty acids are________ at room temperature.
What term is used to describe the arrangement of primary xylem in roots where protoxylem is towards the periphery and metaxylem is towards the center?
Buttoning is the problem in which of the following crops?
Which of the following is appropriate for a clay soil?