Question
"A" can finish a task in 36 days, while "B" can
complete it in 45 days. Both start working on the task together, but "A" stops working after "x" days. The entire task is completed in 30 days. Find the value of "x".Solution
Let, total amount of work = 180 units (LCM of 36 and 45) Efficiency of A = 180/36 = 5 units per day Efficiency of B = 180/45 = 4 units per day According to question; 9 × x + 4 × (30 – x) = 180 Or, 9x – 4x = 180 – 120 Or, 5x = 60 Or, x = 12
AC and CE are the medians of triangle ABD and ACD respectively. If area of triangle ACE is 15 cm 2 , then find the area of triangle ABD.
B1 is a point on the side AC of ∆ ABC and B1B is joined. line is drawn through A parallel to B1B meeting BC at A1 and another line is drawn through C ...
O and C are the respectively orthocentre and circumcentre of ∆PQR. The line PO is extended which intersect line QR at S. such that, ∠QCR = 140°, �...
Find the area of triangle having sides 7 m, 24 m, and 25 m.
In triangle GHI, a point J lies on side HI such that ∠GJH = ∠GJI. If GH = 50 cm, GI = 30 cm, and HI = 40 cm, find the length of HJ.
In a given Figure, ON ∥ QR and MN ∥ OR.
If in a ΔABC, AD is internal angle bisector & D is a point on BC, AB = 9 cm, BC = 12 cm then what is BD:CD?
PQRS is a cyclic quadrilateral of which PQ is the diameter. Diagonals PR and QS intersect at A. If SQR = 25°, then angle PAS measures
- Two chords PQ and RS intersect each other at point ‘A’ inside the circle. If PQ = 5 cm, RA = 3.6 cm and AQ = 1.8 cm, find the length of RS.
If the points P(2, 3), Q(5, a) and R(6, 7) are co-linear, then find the value of 'a'.