Question
A group of 'x' men can finish a job in 46 days. If 8
additional men had joined the group, they could have completed the same job 16 days earlier. Assuming all men work at the same efficiency level, determine the value of 'x'.Solution
Let efficiency of each man = ‘M’ units/day ATQ, (x × M × 46) = {(x + 8) × M × (46 – 16)} Or, 46x = 30x + 240 Or, 16x = 240 Or, x = (240/16) = 15
_____________ is the most critical factor in the maintenance of seed germination and viability of seed during storage.
The Central Rice Research Institute (CRRI) in India has been pivotal in rice research and development. Where is it headquartered?
Pekoe is related to the crop
Chemical formula of Gypsum is?
Single-humped Arabian Camel species found in India, are commonly known as -
Which state contributed the largest share of egg production in India during 2023-24?
How many ATP molecules can be derived from each molecule of acetyl CoA that enter the Krebs' cycle?
________is a practice of growing strip of crops having poor potential for erosion control (e.g. root crop, cereals) alternated with strips of crops havi...
The synthesis of ATP via electron flow through the ETS, with oxygen as the terminal electron  acceptor,   is  known...
Which entomopathogens fungus role as biological control agent in cotton bollworm?