Question
A and B can complete a job together in 30 days; B and C
can complete the same job together in 25 days, while C and A can complete the same job together in 10 days. In how many days will A, B, and C be able to complete the same job alongside D, who is only 75% as efficient as C?Solution
A+B= 30 B+C=25 C+A=10days LCM of 30, 25, and 10 = 150 A+B    B+C     C+A 30       25       10           150  5         6       15 Total 2(A+B+C) = 5+6+15+=26 A+B+C =13 C = 13-5 =8 D= 8×75/100 =6 NOW A+B+C+D = 13+6=19 SO total days = 150/19 =7(17/19) days
What is the amount of Topik 10% WP required for 4000 m² wheat field if the rate of application of Clodinafop-propargyl is 60 g ha¹¹?
For mechanical harvesting of sugarcane-by-sugarcane harvester the crop should be plantedÂ
The nucleus of an atom consists of-
Which plant hormone is referred to as the "stress hormone" and induces stomatal closure during water stress?
Which of the following statement is/are true about herbicide resistance
The scientific study of soil management and crop production, including irrigation and the use of herbicides, pesticides, and fertilizers is called
What is the initial attachment point of the zygote to the embryo sac wall during zygote formation?
Tree banding is done in mango trees to control ______ insect pest.
Indian Institute of pulse research is located at
Match List I with list II