Question
A, B, C can do a piece of work in 11 days, 20 days, and
22 days respectively. If B works daily and is supported by A and C on alternate days beginning with A, then in how many days will the work be finished?Solution
ABC 112022 220 201110 working fashion = (A +B, C + B)Ā 2 days = 31 + 21 = 52 unitsĀ 8 days = 208 unitsĀ Remaining work =220-208=12unit 9 days = 12/31 => 220units Total time =8+(12/31) days=8 +(12/31 days
Aluminium Phosphide is used to control stored grain pest _____
āCenteringā. The first cut on a young tea plant is at which of the following:Ā
Water is drawn upwards from the water table in a continuous network of pores. This upward movement of water occurs only in saturated soils is called
What is the major limitation of privatized extension services?
The land-related reform enacted to protect tenants from eviction and secure their right to cultivate the land is known as:
Triazines and triazinones inhibit ______
The critical limit for NO3-N (mg/litre) in drinking water (as per WHO standard is:
Khaira disease of rice can be controlled by spraying of ____________ .
Bengal famine in 1943 was caused due to which disease?
The scientific name of the Italian honey bee is