Question
Ram can do a piece of work in 12 days and Shyam can do
the same work in 20 days. They both started work together, Ram left 4 days before the completion of the work. Then the total work is completed in how many days?Solution
Required Answer = [((20-4) ×12)/ (12+20)] + 4 = (16 × 12)/32 + 4 = 10 days
In which of the following crop staggering is not required for hybrid seed production?
1 Gray(Gy) =
The bacterial disease, citrus greening is spread by _____ vector.Â
Ozone concentration in the atmosphere is reduced by
DFRL located at
The MSP for Fair Average Quality (FAQ) of milling copra has been increased to Rs____ per quintal for 2022 season from Rs.10,335/- per quintal in 2021
First KVK in India was established at
What is the amount of Topik 10% WP required for 4000 m² wheat field if the rate of application of Clodinafop-propargyl is 60 g ha¹¹?
Argemone mexicana adulterates the quality of which of the following?
Which of the following methods of irrigation has highest water use efficiency?