Question
Ratio of the work done by P, Q and R in one day is 7:3:8
respectively. They all together can complete the work in 42 days. Q and R worked on it for 21 days. In how many days P will complete the remaining work.Solution
Let total amount work be = 42 x 18 = 756 units Amount of work done by Q and R in 21 days = 21 x 11 = 231 units Amount of work left = 756 – 231 = 525 Required time = 525/7 = 75 days
The area of an equilateral triangle is 16√3 sq m. Its perimeter isÂ
The perimeter of a rectangular field is 240 meters, and its length is 20% more than its breadth. What is the area of the field?
In ∆ABC, AB = 5cm, BC = 6cm and AC = 10cm then find out the value of cos A?
A set of data is presented in the form of a frequency distribution table with class intervals and their respective frequencies. The lower boundary of th...
The length of the each side of an equilateral triangle is 28√3. The area of incircle, (cm 2 ) is
The length of a tangent from a point A at a distance 5 cms. from the centre of the circle is 4 cms. Radius of the circle is
Consider two concentric circles having radii 17 cm and 15 cm. What is the length (in cm) of the chord, of the bigger circle, which is a tangent to the s...
A and B are the centres of two circles with radii 11 cm and 6 cm respectively. A common tangent touches these circles at P & Q respectively. If AB =...
In ABC,D is a point on side AB such that BD = 2 cm and DA = 3 cm. (E is a point on BC such that DE) AC, and AC = 4 cm. Then (Area of A BDE) : (Area of ...