Question
Ratio of the work done by P, Q and R in one day is 7:3:8
respectively. They all together can complete the work in 42 days. Q and R worked on it for 21 days. In how many days P will complete the remaining work.Solution
Let total amount work be = 42 x 18 = 756 units Amount of work done by Q and R in 21 days = 21 x 11 = 231 units Amount of work left = 756 โ 231 = 525 Required time = 525/7 = 75 days
Consider two concentric circles having radii 17 cm and 15 cm. What is the length (in cm) of the chord, of the bigger circle, which is a tangent to the s...
If O is the orthocentre of ΔABC , if ∠ BOC = 105 0 then what is the measure of ∠ BAC?
In the given figure CD is parallel to AB then ∠y is?

If O is circumcentre of acute angled triangle ABC, if ∠ OBC = 150 then ∠BAC = ?
- Length of a chord in a circle of radius 'r' cm, is 40 cm and distance between chord and centre of the circle is 21 cm. Find the value of (2r + 1).
The sides of a triangle are 10 cm, 17 cm, and 21 cm. Find the area of the triangle using Heronโs formula.
The radius of the incircle of a triangle is 8 cm. if the area of the triangle is 56 cm 2 , then its perimeter is?
The internal bisector of โABC at โ A cuts BC on D and cuts the circumcircle at E. If DE = 6cm, AC = 8cm and AD = 10 cm, then find the length of AB?
Find the area of triangle having sides 5 m, 6 m, and 9 m.