Question
‘A’ and ‘B’ can do a piece of work in 30 days
and 20 days, respectively. If they started the work together and worked on it for 4 days, then find the time taken by ‘B’ alone to complete the remaining work.Solution
Let total amount of work be 60 units Efficiency of ‘A’ = 60/30 = 2 units/day Efficiency of ‘B’ = 60/20 = 3 units/day Amount of work done by ‘A’ and ‘B’ together in 4 days = (2 + 3) × 4 = 20 units Time taken by B to complete remaining work = (60 – 20)/3 = 40/3 days
A 200 m long train at the speed of 60 km/h crosses another train as fast as twice the speed of first and running in opposite direction in 10 sec. Find t...
Select the option figure which is embedded in the given figure (rotation is NOT allowed).
If a mirror is placed on the shaded line, which of the following options is the correct image of the given shape?
In a certain code language, ‘ADVANCE’ is written as ‘VDAAECN’ and ‘BABYSIT’ is written as ‘BABYTIS’. How will ‘AFFABLE’ be written i...
Three of the following four letter-clusters are alike in a certain way and one is different.
Pick the odd one out.
Select the set in which the numbers are related in the same way as are the numbers of the given sets.
(NOTE: Operations should be performed on th...
Select the combination of letters that when sequentially placed in the blanks of the given series will complete the series.
GA_B M_PB SA_B YAB_ _AHB
Choose the correct option in which the given figure is embedded
Three of the following four letter-clusters are alike in a certain way and one is different. Pick the odd one out.
PTXB
GKOS
HKNQ
MQUY
Three statements are given, followed by three conclusions numbered I, II, and III. Assuming the statements to be true, even if they seem to be at varian...