Question
‘A’ and ‘B’ can do a piece of work in 30 days
and 20 days, respectively. If they started the work together and worked on it for 4 days, then find the time taken by ‘B’ alone to complete the remaining work.Solution
Let total amount of work be 60 units Efficiency of ‘A’ = 60/30 = 2 units/day Efficiency of ‘B’ = 60/20 = 3 units/day Amount of work done by ‘A’ and ‘B’ together in 4 days = (2 + 3) × 4 = 20 units Time taken by B to complete remaining work = (60 – 20)/3 = 40/3 days
Select the option that is related to the third number in the same way as the second number is related to the first number.
19: 304:: 22: ‘?’.
- ‘Earthquake’ is related to ‘Seismograph’, in the same way as ‘Blood Pressure’ is related to ‘____’.
Select the set in which the numbers are related in the same way as are the numbers of the following sets:
(7,11, 72)
(5, 8, 39)
(NO...
If 84 % 6 @ 5 = 9 and 132 % 11 @ 3 = 9, then 256 % 8 @ 17 = ?
Select the option that is related to third number-cluster in the same way first number cluster is related to second number-cluster.
47: 65 :: 5...
If MAN = 13114 and MEAN = 135114, then MANNER =
Select the option in which the numbers share the same relationship in set as that shared by the numbers in the given set. (NOTE: Operations should be pe...
Six boxes G, T, D, S, L and W are kept one above another. The bottommost box is numbered as 1 and the topmost box is numbered as 6. G is three boxes bel...
Select the option that is related to the third term in the same way as the second term is related to the first term.
PALM : KZON :: SORE : ?
Select the option that is related to the third number in the same way as the second number is related to first number and the sixth number is related t...