Question
βAβ can do a piece of work in 15 days. βBβ can
do 80% of the same work in 20 days. If they work together for the entire time and get paid Rs.1408, then find the share of βAβ.Solution
Let the total work be 60 units. (LCM of 15 and 20) Efficiency of A = 60/15 = 4 units/day Efficiency of B = (60/20) Γ (80/100) = 12/5 units/day Ratio of the efficiency of A : B = 4 : 12/5 = 5:3 Share of A = (5/8) Γ 1408 = Rs.880
This method of depreciation is suitable for livestock assets
Which of the following micro organism used in production of Single Cell Protein?
Which of the following material is prohibited in organic farming?
What is depicted by the concave shape of the production possibilities curve?
Rocks formed from the solidification of molten magma which is of two types i.e. intrusive and Extrusive rock ; these rocks are called as
Aflatoxin, a mycotoxin produced by Aspergillus, is associated with ____ crop.Β
Which of the following is known as Egyptian cotton?
What is the botanical name of Sal tree?Β
Which of the following statements is true regarding WHO?
What is the name of trap used in IPM to lure the male insects?