Question
A can do a work in 9 days and B in 12 days. If they work
on it together for 3 days then in how many days the remaining work will be completed by B?Solution
Total work = Number of days × 1 day’s work (efficiency) Total work = LCM (9, 12) = 36 unit 1 day’s work of A = 36/9 = 4 unit 1 day’s work of B = 36/12 = 3 unit 1 day’s work of (A + B) = 4 + 3 = 7 unit Now, 3 day’s work of (A + B) together = 3 × 7 = 21 unit Remaining work = 36 – 21 = 15 Remaining work completed by B = 15/3 = 5 days
‘A’ and ‘B’ started moving towards each other at same time with a speed of 12 km/hr and 6 km/hr, respectively. If the distance covered by ‘A�...
A Boy plants a bomb at a place in Diwali and starts running at 30 m/s. After 54 seconds the bomb was blast. In how much time the sound of blast will be ...
Find the distance travelled (in km) by the truck to reach point B from point A, if a car cover 25% the same distance in 2 hours and a truck covers 30%...
A man running with the speed of 58 km/hr covers a certain distance in ‘x’ hours. If the same distance can be travelled with a speed of 62 km/h in (x...
- A vehicle travels at 36 km/h and is scheduled to reach its destination in 100 minutes. After traveling half the distance, it stops for 10 minutes. What sho...
A cyclist moves at a speed of 'w' km/hr. After 5 hours, they increase their speed to (w + 8) and cycle for another 3 hours. If the ratio of the distance...
Axar covered 1/4th of the total distance at a speed of 25 km/hr. Then, he covered (1/2) of the remaining distance at a speed of 30 km/hr, and the rest o...
A train crosses a pole in 12 sec, and a bridge of length 170 m in 36 sec. Then the speed of the train is:
‘E’ and ‘F’ started moving towards each other at the same time with a speed of 30 km/hr and 25 km/hr, respectively. If the distance covered by �...
In a 500-metre race, ‘A’ beats ‘B’ by 15 seconds or 75 metres. Find the time taken by ‘B’ to finish the race.