Question
P does one fourth as much work as Q in two third of the
time. If together they take 24 days to complete the work, how much time shall Q take to do it?Solution
Let the whole work be done by Q in x days In 2/3 rd of time work by P = 1/4 1/4 of work is done by P in 2/3x days Whole work is done by P in (4 × 2)/(3× x) days = 8/3x days => 1/x + 3/8x = 1/24 => (8+3)/(8x) = 1/24 => x = 33 days
Six laptops, M, N, O, P, Q and R, are placed in a row facing towards the north (not necessarily in the same order). M is placed to the immediate left o...
Who among the following are an immediate neighbours of E?
Who among the following sits at extreme left end of the row?
Who is the husband of S?
What is B’s position with respect to A?
Four of the following five are alike in a certain way and hence form a group. Find the one that doesn’t belong to that group.
Which of the following is not correct regarding S?
Seven girls T, U, V, W, X, Y and Z are sitting around a circular table facing opposite the centre (not necessarily in the same order). X is second to th...
Answer the following questions based on the information given below.
If A@B means A is the son of B.
A#B means A is the father of B.
...T, U, V, W and X are standing in a row facing north. W is the immediate neighbour of T and X. U is at the right of X and V is in the extreme right. Who ...