Question
P does one fourth as much work as Q in two third of the
time. If together they take 24 days to complete the work, how much time shall Q take to do it?Solution
Let the whole work be done by Q in x days In 2/3 rd of time work by P = 1/4 1/4 of work is done by P in 2/3x days Whole work is done by P in (4 × 2)/(3× x) days = 8/3x days => 1/x + 3/8x = 1/24 => (8+3)/(8x) = 1/24 => x = 33 days
Urea is a —
The process of covering water pipes made of Iron with Zinc layer to prevent corrosion is called:Â
In addition to hydrogen the other abundant element present on Sunsurface is
The total energy of revolving electron in an atomÂ
When water itself combines chemically with some element or mineral it is calledÂ
When Hydrogen starts burning in air it produces?
Which of the following is an iron ore ?Â
Which one of the following elements is used in the manufacture of fertilizers?
Which of the following is the major constituent of LPG?Â
The element used for making solar cells is